REPUBLIC OF TUNISIA
Ministry of Industry, Mines and Energy
NOM's RSS Feed
  1.  Rapport d'activités 2023
    Activity Report 2023
  2. Programme Technique 2024
    Technical Program 2024
Outil de recherche métadonnées
  1. REALIZATION OF THE TRAINING PLAN FOR THE YEAR 2022
    REALIZATION OF THE TRAINING PLAN FOR THE YEAR 2022
  2. ACQUISITION OF TWO SERVICE CARS
    ACQUISITION OF TWO SERVICE CARS
  3. ACQUISITION OF GEORADAR EQUIPMENT AND ITS ACCESSORIES
    ACQUISITION OF GEORADAR EQUIPMENT AND ITS ACCESSORIES
Invest in Tunisia
Useful links
Online resources
Online Poll
What do you think of our site ?
Excellent
Very good
Good
Medium


View Poll Results

Search Biblio.
:: Documentation and Editions >> Research library
 

[ Search by author ] [ Search keyword ] [ Search by index ] [ Search by category ]



title of the reference :  Preliminary feasibility report beneficiation and dearsenization of Nefzas iron ores
Publication Date: 1966
Author : Stanley Engineering Company, Secrétariat d'Etat au Plan et à l'Economie Nationale
Catalogue type : Livre
Catalogue reference : Preliminary feasibility report beneficiation and dearsenization of Nefzas iron ores The authorized objective of this study was to examine the feasibility of removing arsenic from the Nefzas iron ores. As studies progressed, il was found that other objectionable minor elements, lead and zinc, were present in addition to arsenic. The feasibility of the removal of these three elements depends upon the cost of the crude ore that would be treated. Therefore, this report includes a preliminary appraisal of mining in addition to the processus for reducing the minor elements. substance utile ; fer substance ; réserve ; gîte minéral ; arsenic ; zinc ; plomb ; Tunisie ; Tunisie Nord Occidentale ; Nefza ; Tamra ; Bourchiba ; Sejnane ; El Harrech ; Sidi Driss ; Douaria Stanley Engineering Company Secrétariat d'Etat au Plan et à l'Economie Nationale Gîtologie
Indexation decimale : Gîtologie
Keywords : substance utile ; fer substance ; réserve ; gîte minéral ; arsenic ; zinc ; plomb ; Tunisie ; Tunisie Nord Occidentale ; Nefza ; Tamra ; Bourchiba ; Sejnane ; El Harrech ; Sidi Driss ; Douaria
Summary : The authorized objective of this study was to examine the feasibility of removing arsenic from the Nefzas iron ores. As studies progressed, il was found that other objectionable minor elements, lead and zinc, were present in addition to arsenic. The feasibility of the removal of these three elements depends upon the cost of the crude ore that would be treated. Therefore, this report includes a preliminary appraisal of mining in addition to the processus for reducing the minor elements.
Exemplaries : RI1597


 

NOM’s head office 24, Street of Energy, 2035 Charguia - Tunis | BP: 215 - 1080 Tunis Cedex - Tunisia | Phone:(216) 71 808 013 / 71 808 266 - Fax (216) 71 808 098
All rights reserved ©2024 National Office of Mines
Last update :2024-04-26