tunisieRepublique Tunisienne
Ministère de l'Industrie, des Mines et de l’Energie
  • arabe
  • francais
  • anglais
Flux RSS ONM
  1.  Rapport d'activités 2023
    Rapport d'activités 2023
  2. Programmes Techniques 2024
    Programmes Techniques 2024
Outil de recherche métadonnées
  1. Acquisition des tickets restaurant pour le personnel de l’ONM
    ACQUISITION DES TICKETS RESTAURANT POUR LE PERSONNEL DE L’ONM
  2. Choix d’une compagnie d’assurance au profit de l’ONM
    CHOIX D’UNE COMPAGNIE D’ASSURANCE
  3. ACQUISITION ET MISE EN ŒUVRE D’UN PROGICIEL DE GESTION INTEGRE
    ACQUISITION ET MISE EN ŒUVRE D’UN PROGICIEL DE GESTION INTEGRE
Investir en Tunisie


Liens Utiles
Ressources en lignes
Sondages en ligne
Que pensez-vous de notre site ?
Excellent
Très bien
Bien
Moyen


Voir résultats des sondages
Search Biblio.
:: Documentation and Editions >> Research library
 

[ Search by author ] [ Search keyword ] [ Search by index ] [ Search by category ]



title of the reference :  Gisement of Bou-grine
Publication Date: 1988
Author : ONM
Catalogue type : Livre
Catalogue reference : Gisement of Bou-grine Synthetic presentation Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations. zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine ONM Gîtologie Office National des Mines
Indexation decimale : Gîtologie
Keywords : zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine
Summary : Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations.
Exemplaries : RI942A, RI942B


 

Siège social de l'ONM 24,rue de L'Energie, 2035 La Charguia - Tunis | BP: 215 - 1080 Tunis Cedex - Tunisie | Tél:(216) 71 808 013 / 71 808 266 - Fax (216) 71 808 098
Tous droits réservés ©2024 Office National des Mines
Dernière mise à jour :25-04-2024