Programme annuel & rapport de suivi technique |
-
Rapport d'activités 2023
-
Programmes Techniques 2024
|
Géocatalogue |
|
Appels d'Offres |
-
ACQUISITION DES TICKETS RESTAURANT POUR LE PERSONNEL DE L’ONM
-
CHOIX D’UNE COMPAGNIE D’ASSURANCE
-
ACQUISITION ET MISE EN ŒUVRE D’UN PROGICIEL DE GESTION INTEGRE
|
Investir en Tunisie |
|
|
|
::
Documentation and Editions
>>
Research library
|
|
|
[
Search by author
]
[
Search keyword
]
[
Search by index
]
[
Search by category
]
title of the reference :
|
Preliminary feasibility report beneficiation and dearsenization of Nefzas iron ores
|
Publication Date:
|
1966
|
Author :
|
Stanley Engineering Company, Secrétariat d'Etat au Plan et à l'Economie Nationale
|
Catalogue type :
|
Livre
|
Catalogue reference :
|
Preliminary feasibility report beneficiation and dearsenization of Nefzas iron ores The authorized objective of this study was to examine the feasibility of removing arsenic from the Nefzas iron ores. As studies progressed, il was found that other objectionable minor elements, lead and zinc, were present in addition to arsenic. The feasibility of the removal of these three elements depends upon the cost of the crude ore that would be treated. Therefore, this report includes a preliminary appraisal of mining in addition to the processus for reducing the minor elements.
substance utile ; fer substance ; réserve ; gîte minéral ; arsenic ; zinc ; plomb ; Tunisie ; Tunisie Nord Occidentale ; Nefza ; Tamra ; Bourchiba ; Sejnane ; El Harrech ; Sidi Driss ;
Douaria Stanley Engineering Company Secrétariat d'Etat au Plan et à l'Economie Nationale Gîtologie
|
Indexation decimale :
|
Gîtologie
|
Keywords :
|
substance utile ; fer substance ; réserve ; gîte minéral ; arsenic ; zinc ; plomb ; Tunisie ; Tunisie Nord Occidentale ; Nefza ; Tamra ; Bourchiba ; Sejnane ; El Harrech ; Sidi Driss ;
Douaria
|
Summary :
|
The authorized objective of this study was to examine the feasibility of removing arsenic from the Nefzas iron ores. As studies progressed, il was found that other objectionable minor elements, lead and zinc, were present in addition to arsenic. The feasibility of the removal of these three elements depends upon the cost of the crude ore that would be treated. Therefore, this report includes a preliminary appraisal of mining in addition to the processus for reducing the minor elements.
|
Exemplaries :
|
RI1597
|
|
|
|
|
|