tunisieRepublique Tunisienne
Ministère de l'Industrie, des Mines et de l’Energie
  • arabe
  • francais
  • anglais
Flux RSS ONM
  1. Programmes Techniques 2025
    Programmes Techniques 2025
  2.  Rapport d'activités 2023
    Rapport d'activités 2023
Outil de recherche métadonnées
  1. DESIGNATION D’UN REVISEUR COMPTABLE POUR LES EXERCICES 2025-2026-2027
    DESIGNATION D’UN REVISEUR COMPTABLE POUR LES EXERCICES 2025-2026-2027
  2. ACQUISITION DE MATERIEL INFORMATIQUE ET EQUIPEMENTS RESEAUX
    ACQUISITION DE MATERIEL INFORMATIQUE ET EQUIPEMENTS RESEAUX
Investir en Tunisie


Liens Utiles
Ressources en lignes
Sondages en ligne
Que pensez-vous de notre site ?
Excellent
Très bien
Bien
Moyen


Voir résultats des sondages
Search Biblio.
:: Documentation and Editions >> Research library
 

[ Search by author ] [ Search keyword ] [ Search by index ] [ Search by category ]



title of the reference :  Gisement of Bou-grine
Publication Date: 1988
Author : ONM
Catalogue type : Livre
Catalogue reference : Gisement of Bou-grine Synthetic presentation Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations. zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine ONM Gîtologie Office National des Mines
Indexation decimale : Gîtologie
Keywords : zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine
Summary : Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations.
Exemplaries : RI942A, RI942B


 

Siège social de l'ONM 24,rue de L'Energie, 2035 La Charguia - Tunis | BP: 215 - 1080 Tunis Cedex - Tunisie | Tél:(216) 71 808 013 / 71 808 266 - Fax (216) 71 808 098
Tous droits réservés ©2025 Office National des Mines
Dernière mise à jour :01-07-2025