REPUBLIC OF TUNISIA
Ministry of Industry, Mines and Energy
NOM's RSS Feed
  1.  Rapport d'activités 2023
    Activity Report 2023
  2. Programme Technique 2024
    Technical Program 2024
Outil de recherche métadonnées
  1. REALIZATION OF THE TRAINING PLAN FOR THE YEAR 2022
    REALIZATION OF THE TRAINING PLAN FOR THE YEAR 2022
  2. ACQUISITION OF TWO SERVICE CARS
    ACQUISITION OF TWO SERVICE CARS
  3. ACQUISITION OF GEORADAR EQUIPMENT AND ITS ACCESSORIES
    ACQUISITION OF GEORADAR EQUIPMENT AND ITS ACCESSORIES
Invest in Tunisia
Useful links
Online resources
Online Poll
What do you think of our site ?
Excellent
Very good
Good
Medium


View Poll Results

Search Biblio.
:: Documentation and Editions >> Research library
 

[ Search by author ] [ Search keyword ] [ Search by index ] [ Search by category ]



title of the reference :  Gisement of Bou-grine
Publication Date: 1988
Author : ONM
Catalogue type : Livre
Catalogue reference : Gisement of Bou-grine Synthetic presentation Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations. zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine ONM Gîtologie Office National des Mines
Indexation decimale : Gîtologie
Keywords : zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine
Summary : Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations.
Exemplaries : RI942A, RI942B


 

NOM’s head office 24, Street of Energy, 2035 Charguia - Tunis | BP: 215 - 1080 Tunis Cedex - Tunisia | Phone:(216) 71 808 013 / 71 808 266 - Fax (216) 71 808 098
All rights reserved ©2024 National Office of Mines
Last update :2024-05-04