Annual program and technical progress report |
-
Activity Report 2024
-
Technical Program 2025
|
Geocatalogue |
|
Invitation to
tender |
-
ACQUISITION OF TWO CARS AO 01/2025
|
Invest in Tunisia |
|
|
|
::
Documentation and Editions
>>
Research library
|
|
|
[
Search by author
]
[
Search keyword
]
[
Search by index
]
[
Search by category
]
title of the reference :
|
Gisement of Bou-grine
|
Publication Date:
|
1988
|
Author :
|
ONM
|
Catalogue type :
|
Livre
|
Catalogue reference :
|
Gisement of Bou-grine Synthetic presentation Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations.
zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine ONM Gîtologie Office National des Mines
|
Indexation decimale :
|
Gîtologie
|
Keywords :
|
zinc substance ; exploration minière ; minerai prouvé ; coût charge ; Tunisie ; Tunisie Nord Occidentale ; Bougrine
|
Summary :
|
Although no optimizations were conducted at this stage, on pit design and mill capacities, the project is attractive by its ore value and its favorable location. At this point the financial projections regarding capital and operating costs must be considered as indicative and should be refined by feasibility studies that include deepening of the existing shaft, uderground drifting for a mining test, extraction of a bulck or sample in quantitative sufficient for pilot process testwork, marketing inquires and economical calculations.
|
Exemplaries :
|
RI942A, RI942B
|
|
|
|
|
|